P.O. Box 189 705 Southmoor Place
Godfrey, IL 62035
Phone: (618) 466-3112
Fax: (618) 466-9284
CALL US TODAY · (618) 466-3112
The Lewis and Clark Community College Eco Roadway was designed to allow storm water to permeate into the ground in order to reduce site runoff.
The project consisted of the removal of an existing asphalt road and the installation of a new permeable paver roadway. The scope of work also included an additional student parking lot, additional sidewalks, a new retaining/planter wall and new LED site lighting.